|
|
1.1 root 1: % run this through SLiTeX with the appropriate wrapper
2:
3: \begin{bwslide}
4: \part {FTAM STATUS\\ AS OF 1 JUNE 1987}
5:
6: \begin{nrtc}\bf
7: \item STATUS OF THE FTAM STANDARD
8:
9: \item USER PROFILES
10:
11: \item CONFORMANCE TESTING
12: \end{nrtc}
13: \end{bwslide}
14:
15:
16: \begin{note}\em
17: strong disclaimer: this section of the presentation is a limited snapshot of
18: the state of the world as of june first
19:
20: everything will have changed by june second
21: \end{note}
22:
23:
24: \begin{bwslide}
25: \part* {STATUS OF THE FTAM STANDARD}\bf
26:
27: \begin{nrtc}
28: \item FTAM IS CURRENTLY A DRAFT INTERNATIONAL STANDARD (DIS)
29: AS OF OCTOBER, 1986
30:
31: \item THE DRAFT OF THE FTAM INTERNATIONAL STANDARD (IS) WILL PROBABLY
32: BE AVAILABLE BY THE FOURTH QUARTER, 1987
33:
34: \item MOST RELATED STANDARDS IN PLACE PRIOR TO THEN
35: \end{nrtc}
36: \end{bwslide}
37:
38:
39: \begin{bwslide}
40: \ctitle {THE FINAL FTAM STANDARD\\ WILL PROBABLY:}
41:
42: \begin{nrtc}
43: \item INCLUDE MORE TUTORIAL INFORMATION!
44:
45: \item SIMPLIFY THE RELIABLE AND USER-CORRECTABLE SERVICE LEVELS INTO ONE
46: (USER-VISIBLE) SERVICE LEVEL
47:
48: \item MAKE THE SERVICE CLASS NEGOTIABLE
49:
50: \item SIMPLIFY THE SYNTAX OF FADUs SOMEWHAT (FA, DU and DE MAPPINGS)
51:
52: \item CORRECT A NUMBER OF BUGLETS AND TYPOS
53: \end{nrtc}
54: \end{bwslide}
55:
56:
57: \begin{bwslide}
58: \part* {USER PROFILES}\bf
59:
60: \begin{nrtc}
61: \item MOST U.S. PROFILES SEEM TO HAVE ALIGNED WITH
62: NBS IMPLEMENTATION AGREEMENTS FOR OSI PROTOCOLS
63: \begin{nrtc}
64: \item GOSIP
65:
66: \item MAP/TOP
67:
68: \item COS
69: \end{nrtc}
70:
71: \item EUROPEANS SEEM VERY INTERESTED AS WELL
72: \begin{nrtc}
73: \item SPAG
74:
75: \item CEN/CENELEC
76:
77: \item CEPT
78: \end{nrtc}
79:
80: \item STANDARDIZATION OF FUNCTIONAL PROFILES IS OCCURING BETWEEN THESE
81: GROUPS
82: \end{nrtc}
83: \end{bwslide}
84:
85:
86: \begin{bwslide}
87: \part* {CONFORMANCE TESTING}\bf
88:
89: \begin{nrtc}
90: \item THE NATIONAL PHYSICAL LABORATORY IN THE UK IS BUILDING AN
91: FTAM (AND EMBEDDED SESSION) TESTING SYSTEM
92:
93: \item THE NATIONAL COMPUTER CENTRE (UK) WILL RUN THEIR FTAM CONFORMANCE
94: TESTING SERVICE BASED ON THIS SYSTEM
95:
96: \item THE NCC IS MAKING THIS FTAM TESTING SYSTEM AVAILABLE TO COS AND
97: VARIOUS EUROPEAN TESTING SERVICES
98:
99: \item HENCE, THERE SHOULD BE HARMONIZATION OF CONFORMANCE TESTING BETWEEN
100: THE US AND EUROPE
101: \end{nrtc}
102: \end{bwslide}
103:
104:
105: \begin{note}\em
106: to summarize:
107:
108: things may be finalized by mid-1988
109: \end{note}
This archive runs on limited infrastructure. Preserving old code on modern bandwidth. Automated agents are requested to crawl responsibly.